TEST - The 8 Wastes of Lean, Applied to Warehousing
This is a formatting test post. Delete after checking. Heading level 2: Why the 8 wastes matter Most operators can recite TIMWOODS long before they can spot the wastes in their own building. This paragraph checks bold , italics and a link . Heading level 3: Where to start Pick one waste, not eight. A team chasing every waste at once fixes none of them well. Measure before you fix. A five-minute gemba walk beats an assumption. Fix the handoff, not the person. Most floor waste starts upstream. A waste you can't see on the floor is a waste you'll never eliminate from a spreadsheet. The diagram below is attached to this email as an image file.