TEST - The 8 Wastes of Lean, Applied to Warehousing
This is a formatting test post. Delete after checking.
Heading level 2: Why the 8 wastes matter
Most operators can recite TIMWOODS long before they can spot the wastes in their own building. This paragraph checks bold, italics and a link.
Heading level 3: Where to start
- Pick one waste, not eight. A team chasing every waste at once fixes none of them well.
- Measure before you fix. A five-minute gemba walk beats an assumption.
- Fix the handoff, not the person. Most floor waste starts upstream.
A waste you can't see on the floor is a waste you'll never eliminate from a spreadsheet.
The diagram below is attached to this email as an image file.
Comments
Post a Comment